Software Engineering: MCQ Set – 11

Software Engineering: MCQ Set – 11

Q101: Which of the following is a category of a stimuli?

  • (A) Periodic stimuli
  • (B) Software stimuli
  • (C) Hardware stimuli
  • (D) Management stimuli

Q102: Which of the following activities may be included in a real-time software design process?

  • (A) Platform selection
  • (B) Timing analysis
  • (C) Process design
  • (D) All of the mentioned

Q103: Which of the following is not a real-time architectural pattern

  • (A) Observe and React
  • (B) Environmental Control
  • (C) Embedded System
  • (D) Process Pipeline

Q104: RTOS stands for

  • (A) real-life operating system
  • (B) real-time operating system
  • (C) real-time operating software
  • (D) real-life operating software

Q105: The times by which stimuli must be processed and some response produced by the system is known as

  • (A) Compile time
  • (B) Frequency
  • (C) Deadlines
  • (D) Execution time

Q106: The switch to backup power must be completed within a deadline of

  • (A) 50 ms
  • (B) 55 ms
  • (C) 70 ms
  • (D) 100 ms

Q107: An example of a system that may use a process pipeline is a _________

  • (A) High-speed data acquisition system
  • (B) Failure of a power supply in an embedded system
  • (C) Both High-speed data acquisition system AND Failure of a power supply in an embedded system
  • (D) None of the mentioned

Q108: Periodic occur irregularly and unpredictably and are usually signaled using the computer’s interrupt mechanism.

  • (A) True
  • (B) False

Q109: If you detect power failure by monitoring a voltage level, you have to make more than one observation to detect that the voltage is dropping.

  • (A) True
  • (B) False

Q110: The average execution time of the power monitor process should be less than

  • (A) 1ms
  • (B) 10ms
  • (C) 100ms
  • (D) none of the mentioned

Answer:

QuestionQ101Q102Q103Q104Q105Q106Q107Q108Q109Q110
AnswerADCBCAABAA